"Excel builder for Scrappers ( Postapoc rules by Osprey )" Topic
2 Posts
All members in good standing are free to post here. Opinions expressed here are solely those of the posters, and have not been cleared with nor are they endorsed by The Miniatures Page.
Remember that you can Stifle members so that you don't have to read their posts.
For more information, see the TMP FAQ.
Back to the 28mm Sci-Fi Message Board Back to the Post-Apocalypse Discussion Message Board
Areas of InterestScience Fiction
Featured Hobby News Article
Featured Link
Featured Ruleset
Featured Showcase Article
Current Poll
Featured Movie Review
|
seldonH | 31 May 2017 6:44 a.m. PST |
Ok.. that was weird.. Posted this but appeared duplicate … second try :) If you are getting started with Scrappers, or you just need a tool to help design your Crew here you can find a file that a friend of mine has done on excel . It is a pretty cool tool with a builder tab where you create your guys and then a couple of summary tabs that collect all the data for your crew, even a tab where this data gets incorporated into the Roster. You still need to read the design rules in detail, the validation is not strong enough to enforce all the creation rules, it is only there to easy the process of selecting traits and equipment. It does have a couple of checks to avoid silly mistakes. I'll post this link to where the file resides since we will keep updating it over time. link |
Thomas O | 07 Jun 2017 11:22 a.m. PST |
I have been playing around with the builder, but must be missing something. I create the first Crewman (Commander) in the builder his stats get moved over to the summery, all fine. But how do I start doing the second crewman? If I clear out the builder I loose all the stats in the summery for the first crewman. What am I missing? |
|