Phase 2 continuing.
Progress with 4 boards completed through phase 2 only 8 more to go. However I tackled the more difficult boards first, 2 of them having 3 trenches 1 more with 1-1/2. The next three will have 2 trenches each with the last four only 1 trench each.
One time consuming detail was cutting matchsticks and gluing individually to the trench floor. This was replaced by a suggestion from one of our group to use bamboo mats cut to size. Works Great!
Phase three will be painting the trenches with dark brown and dry brushing lighter colors on the ground everywhere. Adding bits of green and grass towards the rear trenches.
Bamboo mat.
[URL=http://s219.photobucket.com/user/tjm3/media/Vimy%20Ridge/IMG_2277.jpg.html]
[/URL]
Heavy Mortar position on Vimy Ridge.
[URL=http://s219.photobucket.com/user/tjm3/media/Vimy%20Ridge/IMG_2276.jpg.html]
[/URL]
2 Boards finished phase 2.
[URL=http://s219.photobucket.com/user/tjm3/media/Vimy%20Ridge/IMG_2280.jpg.html]
[/URL]
[URL=http://s219.photobucket.com/user/tjm3/media/Vimy%20Ridge/IMG_2281.jpg.html]
[/URL]
Tools of the Trade.
[URL=http://s219.photobucket.com/user/tjm3/media/Vimy%20Ridge/IMG_2282.jpg.html]
[/URL]
Shell holes.
Section of trench.
[URL=http://s219.photobucket.com/user/tjm3/media/Vimy%20Ridge/IMG_2287.jpg.html]
[/URL]
Shell damage.
[URL=http://s219.photobucket.com/user/tjm3/media/Vimy%20Ridge/IMG_2284.jpg.html]
[/URL]
Comments are welcome.