Help support TMP


Preparing the Eagle


Eagle
Product #
20-246
Manufacturer
Suggested Retail Price
$6.50 USD


Back to LPS2 ROUND 3 - REPORT FROM SOUNGURU

Back to Workbench


Revision Log
14 August 2006page first published

Areas of Interest

Science Fiction

Featured Hobby News Article


Featured Link


Featured Showcase Article

15mm Trucks From Hell

Personal logo Editor in Chief Bill The Editor of TMP Fezian struggles to complete his SISI truck force.


2,641 hits since 14 Aug 2006
©1994-2024 Bill Armintrout
Comments or corrections?

sounguru writes:

Okay, the first thing I did was cut the legs loose from the big chunk of metal on the bottom. I also cut the base down to where it was smooth.

Legs cut loose

The next part was to glue a plastic spacer on the base, mount the legs to the circuitboard, and drill a hole to align the point for the brass rod that will support the vid screen.

Legs mounted to new base

Okay, here is a pic of the mech and base. Now I set them aside, and went to work on the vid screen.

Mech and base

To build the vid screen, I just bent the brass rod (after cutting it to length) and glued it to the back of the LCD from the cell phone.

Here are all the parts ready for priming:

Parts ready for priming