Help support TMP


"USS North Dakota Delivered: Unequalled Predator..." Topic


2 Posts

All members in good standing are free to post here. Opinions expressed here are solely those of the posters, and have not been cleared with nor are they endorsed by The Miniatures Page.

Please remember that some of our members are children, and act appropriately.

For more information, see the TMP FAQ.


Back to the Modern Naval Discussion (1946 to 2013) Message Board


Areas of Interest

Modern

Featured Hobby News Article


Featured Recent Link


Featured Ruleset


Featured Showcase Article

20mm U.S. Army Specialists, Episode 6

We're back to stump you again with three more figures!


Featured Profile Article

Other Games at Council of Five Nations 2011

Personal logo Editor in Chief Bill The Editor of TMP Fezian snapped some photos of games he didn't get a chance to play in at Council of Five Nations.


Featured Movie Review


1,012 hits since 7 Sep 2014
©1994-2024 Bill Armintrout
Comments or corrections?


TMP logo

Membership

Please sign in to your membership account, or, if you are not yet a member, please sign up for your free membership account.
Tango0107 Sep 2014 10:43 p.m. PST

… and Industrial Benchmark.

"Last Friday USS North Dakota (SSN 784) delivered to the fleet under budget and two days earlier than its contractual delivery date. As part of the Navy's acceptance, North Dakota was evaluated in the areas of construction and equipment operation by the Board of Inspection and Survey (INSURV) team. The INSURV team assessed this as the best performance to date of any of the 11 Virginia-class submarines serving in the fleet. What makes this even more significant is the superior on time, and under budget performance that was accomplished, despite a 20% redesign of this, the first boat of the Block III Virginia-class submarines. The delivery marks a culmination of over five years of work by the Virginia-class Program Office, the shipbuilders, Supervisors of Shipbuilding, and the rest of the Navy team including a crew of more than 135 sailors who are training to operate forward in defense of our nation.

The arrival of North Dakota is a significant milestone and will improve our existing capabilities. The two newly designed Virginia Payload Tubes (VPTs), each capable of launching six missiles, replace the twelve individual missile tubes that comprised the Vertical Launch System (VLS) in previous submarines. Primarily done to reduce the cost of each submarine, moving from 12 individual cells to two larger diameter tubes has the added benefit of optimizing the equivalent space and providing additional future payload flexibility. In addition to weapons, we may also be able to leverage the efficient use of space in future submarines to deploy unmanned aerial or undersea vehicles for any variety of tasks. The flexibility gained is a significant force multiplier.

Another major, but less obvious war fighting improvement, is the shift from the traditional spherical array to a water backed Large Aperture Bow (LAB) array and advanced combat control system. The LAB array provides improved passive listening capabilities over traditional spherical arrays employed on earlier submarines. The LAB array includes a medium-frequency active array. The hydrophones used to determine a bearing of either incoming passive sounds or active reflected sounds are taken directly from previous design and technology advancements. The hydrophone advancements eliminate the need for Quality Assurance (QA) maintenance related specifically to submarine safety, and ultimately reduces costs. The redesigned bow was one of 100 design changes initiated as a part of the cost reduction strategy. The initiatives resulted in a savings of $100 USD million per hull. These savings, combined with improved performance, are a win by any standard…"

picture

picture

Full article here
link

Amicalement
Armand

Lion in the Stars08 Sep 2014 10:42 a.m. PST

Interesting that they managed to figure out how to make the sonar electrical connections work without needing to meet SubSafe specs. SubSafe work is a nightmare of QA inspections and documentation which adds a whole lot of $$ to the cost and takes a lot of time, too.

I'm halfway surprised that they didn't stick 4 Virginia Payload Modules in there, 2 on each side of the centerline. Those look a lot like the missile hatches on Tridents, and I believe that EB has 'more than a few' of those sitting around.

Sorry - only verified members can post on the forums.